Vuka Karadžića 37, Trebinje
+387 65 929 894

RC “Center 2” – Building 2

project: “Center 2” – building 2

Type: Residential

Investor: “Finest” Ltd

Architect: “Put inženjering”

Location: Zasad polje, Trebinje

Started: March, 2021.

Finised: August, 2022.

Download PDF catalog

Monitor the construction

location
TECHNICAL DESCRIPTION OF THE BUILDING

The facility is located in the urban part of Trebinje. It consists of 78 apartments. It is divided into two lamellae. The projected number of storeys of the building is G + P + 5 + PE. The facility meets the highest quality standards when it comes to sound and thermal insulation. All external openings are made of PVC hardware, five-chamber profiles with thermal break. The facade is made with thermal insulation 8 cm thick. The final layer is a silicone-silicate base. The walls and floors in the kitchen and bathroom, as well as the hallways, pantries and terraces are covered with first-class porcelain ceramics. Three-layer large-format oak parquet is planned in the living and sleeping rooms. Sanitary devices and equipment in the bathrooms are from the world’s top manufacturers.

The entrance doors to the apartments are anti-burglary, fire-retardant and thermally insulated, covered with white chipboard. The inner door is made of MDF, with grooves. The apartments are equipped with a multi-split heating and cooling system with one outdoor and several indoor units that are placed in the living room and all bedrooms.

Balcony railings are made of laminated tinted glass with aluminum handrail or masonry with aluminum handrail. Each apartment has its own water meter. The apartments are equipped with quality intercom. The building has an electric elevator, adapted for use by people with disabilities, which goes from the garage to the secluded floor, at the top of the building.

lamela 1

S37  81,94
S38  99,55
S39  131,97

S31 34,57
S32 51,83
S33 50,59
S34 52,30
S35 72,68
S36 69,45

S25 34,62
S26 51,88
S27 50,64
S28 52,33
S29 72,73
S30 69,48

S19 34,67
S20 51,92
S21 50,70
S22 52,36
S23 72,78
S24 70,19

S13  34,72
S14  51,95
S15 50,73
S16  52,32
S17  72,78
S18  70,19

S7 34,76
S8 51,98
S9 50,76
S10 52,32
S11 72,79
S12 70,22

S1 34,79
S2  51,99
S3 50,79
S4 52,32
S5  72,85
S6  61,16

lamela 2

S37  81,94
S38  99,55
S39  131,97

S31 34,57
S32 51,83
S33 50,59
S34 52,30
S35 84,65
S36 58,02

S25 34,62
S26 51,88
S27 50,64
S28 52,33
S29 84,68
S30 58,02

S19 34,67
S20 51,92
S21 50,70
S22 52,36
S23 84,71
S24 58,02

S13 34,72
S14 51,95
S15 50,73
S16 52,32
S17 84,73
S18 58,02

S7 34,76
S8 51,98
S9 50,76
S10 52,32
S11 84,75
S12 58,02

S1 34,79
S2  51,99
S3 50,79
S4 52,32
S5 72,81
S6 61,17

OUR PROJECTS
1
REALIZED PROJECTS AND PROJECTS WHICH ARE IN PROGRESS